Intermediate Performance Measures in Engineering Projects


加入日期:2006-4-6 15:23:49
Conventional methods for measuring progress during an engineering project include use of supervisors and milestones,and a variety of scheduling and cost procedures. This exploratory survey draws upon the literature and inputs from
engineering managers to identify other measures employed to provide a comparison of planned with actual progress.

A review of texts on project management indicates that little attention is given to methods of measuring intermediate project performance. Control in engineering projects is usually described as a three step process: create a plan; measure
actual progress, from time-to-time, and compare it with the plan; take corrective action. Plans are usually presented in three interrelated dimensions: time, cost, and performance.

The literature, if not also practice, provides extensive guidance in preparing plans in all three dimensions, provides formats and procedures for comparing actual progress with plan, and provides extensive guidance on methods of taking corrective action.

The measuring of actual progress in the cost dimension is often a matter of bookkeeping discipline. Similarly, the time dimension is presented in calendar units, the present status of which is easy to identify. It seems clear that measuring how
much time has elapsed, or how much money has been expended, tells little about progress on a project if we don't know how much technical progress we have made towards completing the project.

The performance dimension is often presented in terms of specifications and standards, work breakdown structures, linear responsibility charts, Gantt charts, or other descriptions. It is the "measuring" which is treated more summarily; the few explicit mentions include use of supervision, milestones, tests, design reviews, outside experts, and timelcost combinations.

Drawing upon direct involvement in project management, ideas developed teaching project management for over twentyfive years, and information growing out of assignments directed to finding literature references and examples of practices in industry,a number of other, less conventional measures have been identified, including the following: status of related documentation;status of resource utilization; tell tale tasks; downstream tasks (internal to engineering); downstream functions (external to engineering); benchmarking or baselining; "bugs" and rework;reevaluating estimates to completion.
 


·相关文章                         资讯首页  办公资料
·我对软件测试的理解
·软件测试的主要内容与常用方法
·浅论建筑工程项目施工管理的创新
·对装饰工程管理的几点认识
·浅析建筑工程项目成本管理
·施工项目现场成本管理
·对电科企业管理的咨询意见
·浅谈项目管理创新
·工程投标基本策略探讨
·关于项目管理的理论思考
 相关信息
 阅读排行
从十大经典故事学...
什么是管理
办公室员工对号入...
中国四大缺德职业...
管理者应具有的五...
史上最智慧的169条...
从十大经典故事学...
管理故事:小鸟与牛屎
19岁女生一年赚27...
从十大经典故事学...
从“宰相教子”看...
哲理故事(1)
生动一课:不喝中...
人生必读十大启迪...
 推荐阅读